Joined
·
25 Posts
Just got in touch of a local shop to Dyno a few bikes for my buddies, these are all fuel injected with PC-III or V they said it usually takes 2-3 hours per bike and they prefer the customer leave the bike for them to do.
Does this sound right to anyone?
For those that have dyno'ed how long does it take?
it save them from trailering about 100 miles each way to other dyno's,
Thanks.
Does this sound right to anyone?
For those that have dyno'ed how long does it take?
it save them from trailering about 100 miles each way to other dyno's,
Thanks.